I-5 Bridge Replacement Expected to Begin in Late 2025

July 5, 2024|

VANCOUVER, Wash. – A $6 billion project to replace the Interstate 5 Bridge across the Columbia River between Washington and Oregon is moving closer to letting bids for a heavy highway general contractor.

The 5-mile bridge modernization project’s goal is to replace the two existing spans – one built in 1917 and the other built in 1958 – with one 1,381-mile span. The entire modernization project is anticipated to last 10 years, with the span portion occupying five to six years.

A total of seven interchanges are included in the project scope.

Both the Washington and Oregon Depts. of Transportation are collaborating on the project.

I-5 is the only highway stretching from Canada to Mexico and serves as a crucial, intermodal trade route.

 

 

View Our Latest Print Edition

Fresh Content
Direct to Your Inbox


YOUR CONSTRUCTION VOICE IN ST. LOUIS AND BEYOND

Join CNR Magazine today as a Content Partner

As a CNR Content Partner, CNR Magazine promises to support you as you build, design and engineer projects not only in and around St. Louis, but also across the U.S. CNR is equipped and ready to deliver a dynamic digital experience paired with the top-notch, robust print coverage for which you’ve always known and respected the magazine.